Summary
D2.1 includes the following studies:
a) estimated efficiencies for selected electrolysis technologies, b) possibilities for energy integration to improve efficiency, c) typical time span for start-up and shut-down as well as for load changing, d) possibilities and costs for storing excess oxygen to be used in the enriched-air operation of the gasification plant.
More information & hyperlinks