Case Study Report on “Unlocking unused flexibility and synergy in electric power and gas supply systems”

Summary
This case study report is build upon the issue paper and will include an in depth representation of the modelling approach and a detailed representation of the final results. (Planned Length 40 Pages) This deliverable is associated with task 7.3.