Summary
M24 Responsible Partner Hydrocontrol Task 32The guide will describe in a practical manner how to move from intermittent supplies IWS to 24x7 in a costeffective manner Such methods to transition to 24x7 include improved operations and maintenance restructuring the network to improve hydraulic performance replacing part of the distribution system as needed and introducing Active Leakage Control to reduce losses in a costeffective manner
More information & hyperlinks