Summary
The interim technical report is meant to provide an intermediate overview on all the deliverables (DEM) due at M18 and M24 (D2.1, D3.1, D3.2, D3.3, D4.2, D4.3,D5.2, D5.3, D6.1, D6.2, D7.1) with respect to the design, technicalities of the demonstrators (mainly).
It is meant to assure that there is enough substance for the review that will take place right after the end of the first reporting period (M12), and this includes scientific information on top of the management information present in the periodic reports (RP1).
More information & hyperlinks