UHDC retrofitting pilot report

Summary
The deliverable will include the activity dealing with the retrofitting of a r/c water tower in the Grand Harbour region in Malta. It will contain information about the design of the structure and of the monitoring system, integrated and designed for short term and long term monitoring, data collection, communicating and processing, the construction and implementation, the monitoring phase and data collection and the validation of the intervention and decommissioning. Appropriate choice of materials including UHDC mix based on the defined constituents and for the specific site and environmental exposure conditions will be detailed. It will be updated at months 40 and 46. Related to Task 8.5.