Summary
The purpose of this task is to integrate all components of the TwinERGY solution (namely the outputs of WP5, WP6 and WP7) and verify that they comply with the requirements and specifications set out in WP4 and the architecture design. Integration and system testing activities will be carried out to ensure problem-free functional operation. A detailed test plan (including test specifications/cases) will be generated and implemented to guarantee adequate testing coverage of the requirements/specifications. Extensive scalability testing will be performed to validate their operational capacity in large scale deployments. The capacity of the integrated system to fully cover the requirements of the project must be verified before validation activities commence.